1990
McDermott Group of Companies
- Mobile Indonesia, Lor SPM installation, Hook-Up of Hoses.
- Amoseas Indonesia, Pipelaying, Plem Installation, Spool Installation.
- Maxus Indonesia, Laying 6″, 8′, 16′ and 20″ Pipelines, Install Risers, pig & test. Install Widuri P Jacket, Plem SBM & Anchor Piles and Chains. Install lntan B Deck and Hook-Up platform.
- Arco Indonesia, Installed BZZA 4 pile Jacket, LF Wellhead, Decks, Laid 4″ & 6″ Pipelines, Installed Risers, pig & test.
- Maxus Indonesia. Installed lntan B Jacket. Widuri A Jacket. Widuri B Jacket. Widuri C Jacket. Laid 12″ Pipelines, Installed Risers, pig & test.
- Amoseas Indonesia, Set Deck, Modules and Flare boom at ANOA.
- Maxus Indonesia, Widuri Field, Set Deck (Dual Lift with DB-52) Bridges, Pedestal crane. Tripod, Performed Hook-Up On Platform. Set Widuri D Deck and Performed Hook-Up on The same.
- Maxus Indonesia, Set Widuri P Deck (Dual Lift with DB-29).
1991
McDermott Group of Companies
- Arco Indonesia. Repair 14″ Pipeline and Riser, pig & test.
- Maxus Indonesia, Installation of Intan A Deck and associated Hook-Up.
- Arco Indonesia, Laid 12″. 16” Pipelines. Installed Risers, Spools. Deck Extensions.
- EOBL Surubaya, Installed CPP Jacket. Deck and Flare. Laid 6″ and 8″ Pipeline, Set Risers, Installed Plem, Plem Tie-ins, pig & test.
- Conoco Indonesia, Belida field overhauled Calm Buoy, Installed flexible Hoses from buoy to Plem, Tested System.
- Arco Indonesia, Laid 26′ Pipeline, performed beachpull. Subseas, Tie-ins, Dig & test, Installed KLXB Tripod, KLYA Jacket, Laid 8″, 12″, 19″ Pipelines, Risers, pig & test, Set KYLB Deck and performed Hook-Up. Set KYL.B Deck and performed Hook-Up, Installed B2C Jacket. Deck and Performed Hook-Up.
- Conoco Indonesia, Belicia-field laid 12″ pipeline. Installed Plem, Pin piles, Installed OPP-A Jacket, Deck & Topsides, pig & test Pipelines.
1992
- Conoco Indonesia, Belicia-field laid 12″ pipeline. Installed Plem, Pin piles, Installed OPP-A Jacket, Deck & Topsides, pig & test Pipelines.
1993
McDermott Group of Companies
- Arco Indonesia. Installed B2C Jacket. Deck and Modules, Assisted in Hook-Up Program.
1995
- PMarathon Kakap Indonesia, Laying Pipelines.
- Marathon Kakap Indonesia, Performed Hook-Up on KGA & KRA Platforms
1996
- Unocal Indonesia, Santan, Laying 12″, 16″, 24” pipelines, Beachpull.
1997
McDermott Group of Companies
- Unocal Indonesia, Santan, Laying 24” pipeline, installed STA Jacket, Deck, Risers and Hook-Up on Platform, Installed Pedestal crane on CP platform.
- CPIL Kakap Indonesia, Laid 6″ pipeline. Installed Risers. Spool Pieces, pig & test pipeline.
1999
McDermott
- EDB-30, Batam DB Upgrade
- KP-1, Batam
2001
McDermott
- DB-30. Indonesia (Conoco)
- KP-1, Indonesia (Conoco)
2002
McDermott
- DB-30, Indonesia (Phillips Petroleum)
- KP 1. Indonesia (Phillips Petroleum)
- Batam Yard, Indonesia (Talisman Energy)
2003
McDermott
- KP-1, Indonesia (Peciko)
- Batam Yard, Indonesia (TotalFina Elf)
2004
McDermott
- Batam Yard, Indonesia (Chevron)
2005
McDermott
- Batam Yard, Indonesia (MCD)
2006
McDermott
- Batam Yard, Indonesia
2007
McDermott
- Batam Yard, Indonesia (MCD)